|
Most mainline rehabilitation CIPP lining and clip lining procedures
do not solve the problem of leakage into the main caused by
a leaky connection at the service line. Grouting the mainline
or grouting service lines after lining will stop these leaks
and also stop water migrating through the annular space around
the liner.
Each pipeline joint can be individually tested (Air or Water
Test) and, if a failure determined, sealed using a robust
sealing packer.
Where appropriate, chemical grouting is an effective, time
proven, cost effective and long lasting process for water
control and soil stabilization.
Not only does chemical grout seal leaking joints, it also
stabilizes the surrounding soil and fills voids, restores
support to the pipe and forms a water impermeable mass around
pipe joints and manhole walls.
A chemical grouted joint seals off flow from the inside as
well as the outside, preventing future costly water exfiltration
and infiltration.
The grout can withstand normal ground water movement, resist
fracturing upon exposure to dry conditions and in documented
field studies, has provided over 50 years of leak free service.
Jetco has been successful in eliminating infiltration and
exfiltration of water in manholes and pipes through the application
of chemical grouting.
Click here to read more about our individual Cues & Buchen
Chemical Grouting Machines.
|